==
Bike-Walk Alliance of NH == 
Salem
Depot under repair and restoration
.
View from Main Street, November 28, 2007: clean-up underway.
.
Contractor hired by Salem for the clean-up work.
.
Rear view (east side) of station with lead-painted siding removed.
.
Note the fancy woodwork under the eves -- and the old plastic storm windows.
.
Front
of Salem Depot building. Green was the original station color.
Door to be replaced with original "bump-out" ticket window.

December
6, 2007: Salem Depot with "add-a-room" removed.
The windows have been covered for the winter.